With the capacity of 2 x 16.5 MW, PLTU Bolok is expected to stabilize the electricity in Timor Island. Before its exist, the electricity of Timor Island was provided by PLTD Tenau (47 MW) and PLTD Kuanino (10 MW).
Mining & Infrastructure
2017
2017 © - Copyrights Jayamix by SCG. All Rights Reserved.